2025港资料免费大全,7777788888精准新奥,港彩通免费资料9765下载,王中王493333中特马,二四六天天彩(944CC)资料

广告
Location:Home>>Industry News

Industry News

Senvion Wins Orders for 74 Megawatts from RES for Two Wind Projects in France

Time:14 Jan,2016
Senvion, one of the world’s biggest wind turbine manufacturers, has successfully contracted 74 megawatts (MW) with RES for two wind projects in France. Senvion will equip the Sambrès wind farm with 26 Senvion MM82 turbines, in addition 11 Senvion MM92 turbines have been installed for the Bois de la Serre wind farm. These will together produce enough electricity to power more than 24,600 three-person households (including heating) in France every year. Senvion will provide full maintenance services to the wind farms for a period of 10 years with an option to be extended to up to 15 years. Upon completion, the wind farms will save 47,300 metric tons of CO2 emissions every year. The Bois de la Serre wind farm consists of eleven Senvion MM92 turbines, each with a rated power of 2 MW and a hub height of 88.5 meters. The installed turbines have been commissioned by end of December 2015. The Sambrès wind farm will consist of 26 MM82 turbines, each with a hub height of 85 meters. The construction has already started, and five turbines have already been installed. The commissioning of the entire wind farm is planned for mid-2016. Both projects are located in a mountain and forest area where the wind is particularly strong and turbulent. To preserve the forest and avoid cutting down trees, the Senvion turbines were mounted blade by blade and are delivered with specific hub heights to comply with the site conditions. Olivier Perot, Managing Director of Senvion Europe South West, says: “We are proud that RES is continuing its business partnership with Senvion for these complex projects. This highlights the capabilities of Senvion to serve the whole French market with a tailored product and service portfolio.” Matthieu Guérard, Managing Director of RES Southern Europe, adds: “We are very pleased to be building these two projects in the Black Mountain area in Languedoc using Senvion turbines that meet the specific requirements of these technically challenging sites. These new projects, with an installed capacity of 74 MW, add to the 45 MW of wind farms already built by RES in the Black Mountain area, where renewable energies are an important factor for the local economic development.”

CONTACT US

Tel:86-21-55155796;86-21-63563197
Fax:86-21-63561543
Address:No. 3978, Baoan Highway, Anting Town, Jiading District, Shanghai
Email:wf@wfbearings.com
Website:www.cjcpx.com  www.wfbearings.com

Mobile SiteMobile Site

CopyRight 2017 All Right Reserved Shanghai Junwang Bearing Co.,Ltd
主站蜘蛛池模板: 2024澳门天天开奖结果| 澳彩全年历史图库4985期开奖结果| 2024新澳门开奖结果开奖记录| 123900.cσm查询大赢家澳彩2024 匆匆那年电影高清完整版 | 澳门资料570575| 战火中的伊甸园| 澳门六开彩天天免费资料大全聚宝盆丽萍数据 | 二四六香港资料期期准中特| 周处除三害免费观看高清| 求求你爱上我| 贝城亡命之徒| 网剧后来的我们在线观看高清完整版 | steam新网络游戏| 2022香港澳门全年免费资料 | 新澳2025今晚特马开奖号码| 24澳门正版资料免费,2024| 小马宝莉大电影| 2024一肖一码100%中奖| 2022年澳门今晚开奖直播| 网络游戏充值的钱可以退吗| 123开奖澳门开奖资料.2023| 不需要会员的追剧软件还可以下载| X战警:逆转未来| 快乐八8开奖号码今天开奖结果| 精灵鼠小弟2中文版配音| 能看vip的免费追剧软件| cctv5体育足球比赛| 韩国a级电影年轻的妻子| 红姐最准免费资料大全| 好看的电影网免费观看| 今晚开什么码澳门开奖| 新澳历史开奖最新结果查询表格 | 最好看免费观看视频大全| 物流公司货运专线| 澳门123期开奖结果| 澳门彩龙门客栈图资料| 2022年澳门正版资料大全完整版 | 新2025澳门天天开好彩| 2024年澳门49图正版资料| 奥门2024一肖一码| 韩国床戏电影有哪些 |