2025港资料免费大全,7777788888精准新奥,港彩通免费资料9765下载,王中王493333中特马,二四六天天彩(944CC)资料

广告
Location:Home>>Industry News

Industry News

ACWA Power to start work on Morocco wind power project with Vestas wind turbines

Time:12 Jul,2016
Acwa Power, a leading private power and water project developer in the Gulf region, said one of its companies is all set to start the construction of a major wind power project in the north of Morocco. Formerly known as UPC Renewables, Acwa Power Khalladi is 75 per cent owned by Acwa Power – a developer, investor, co-owner and operator of a portfolio of power generation and desalinated water production plants – and 25 per cent by the Arif Investment Fund, a specialist in infrastructure projects. Arif’s shareholders are leading national and international institutions (RMA Watanya, African Bank for Development, European Investment Bank, International Financial Society, Proparco, Bio Invest, and the Belgian Development Agency). This 120 MW wind power farm, located in Jbel Sendouq – Khalladi is the first project to be developed by Acwa Power and Arif under the Moroccan Renewable Energy Law, said a statement from the Saudi-based company. Acwa Power Khalladi has confirmed final orders to suppliers and contractors for the construction of the project, following all conditions precedent for its landmark project financing being satisfied, it added. “This new wind energy project reinforces our positioning as a major player in the country’s renewable energy sector,” said Announcing the new project, Rajit Nanda, the chief investment officer, Acwa Power, said: “Our investment in Morocco is for the long run and with our partner Arif we will be contributing even further to the transformation of the energy sector Morocco is undergoing in alignment with its national strategy.” Once operational, the Khalladi project will directly supply the industrial clients connected to the high voltage network, he stated. The project, under construction since November 2015 and representing a global investment of MAD1.7 billion ($172 million), will result in greenhouse gas reductions of over 200,000 tons of carbon dioxide per year once operational. According to Nanda, this project confirms the commitment of Acwa Power and its partner Arif to the Moroccan National Renewable Energy Strategy/Wind Power plan aiming for 2,000 MW wind power capacity by 2020, representing 14 per cent of the national installed capacity. It will support industrial integration and create job opportunities in the kingdom with approximately 300 workers during the construction peak period.

CONTACT US

Tel:86-21-55155796;86-21-63563197
Fax:86-21-63561543
Address:No. 3978, Baoan Highway, Anting Town, Jiading District, Shanghai
Email:wf@wfbearings.com
Website:www.cjcpx.com  www.wfbearings.com

Mobile SiteMobile Site

CopyRight 2017 All Right Reserved Shanghai Junwang Bearing Co.,Ltd
主站蜘蛛池模板: 澳门6合开彩开奖网址| 港澳最快开奖网| 澳门三肖三码必中特免费资料| 2023年澳门正版资料大全完整版 | 香港开奖结果+开奖记录表香80 | 澳门开特马+开奖结果走势| 2025新澳门天天开好彩大乐透开奖号码| 新澳门开奖结果 开奖结果| 乡村爱情15部电视剧观看 | 新澳门123期资料| 电视剧新乱世佳人高清免费观看| 澳门今晚特马四不像| 2024年新澳门资料查结果| 2024新澳门资料正版大全资料| 2024今晚澳门开奖结果查询表图片大全| 金牛座运势今日最准| 高山榕介绍| 澳门六开彩天天免费领取| 澳门精准资料期期精准网站| 菊次郎的夏天电影原声| 澳门资料大全+正版资料今天的今天开奖的澳 | 守望者:罪恶迷途| 澳门免费看资料2023| 乡村爱情1在线观看| 小叮当:夏日风暴| 澳门一码一肖100准王中王| 新澳门最准资料网址| 2024新澳今晚资料66期| 成人情趣用品炮机| 高手猛料三肖中特买啥开啥68395com| 2024年香港资料内部资料精准网站| 最新的体育赛事新闻| 90后小时候的网络游戏| 澳门天天彩历史记录资料大全| 听说桐岛要退部| 2021澳门开奖结果+| 谎言的诱惑电视剧全集在线观看免费高清| 澳门金财神最新动态| 澳门最准四不像2024| 4组三中三内部精准资料的功能| www.fpzmlvs.com|