2025港资料免费大全,7777788888精准新奥,港彩通免费资料9765下载,王中王493333中特马,二四六天天彩(944CC)资料

广告
Location:Home>>Industry News

Industry News

Fastening solution for offshore wind turbine maintenance hatch

Time:09 Aug,2016
bigHead Bonding Fasteners are regularly challenged to provide custom designed fastening solutions for its customers. While the standard range of more than 400 mild steel and stainless steel ‘bigHeads’ provide efficient and effective discrete fixings, whether embedded or surface bonded to composite materials, there are some applications that benefit from a design approach where the characteristic bigHead welded fixing is engineered and adapted to actually improve the final design, to enhance its performance or reduce costs - and even to facilitate increased safety. One such situation that perfectly exemplifies this engineer-to-engineer process is when Siemens began to investigate composite materials for nacelles used on its new 6MW offshore wind turbines. In particular a composite maintenance hatch had been designed to replace a steel panel and traditional bolt fixings were used to lock and unlock it. This required two persons to perform the operation – one inside and one outside the nacelle. Clearly ease of access and its related safely were problems to be solved, in addition to reducing maintenance costs. Siemens nacelle suppliers approached bigHead and together a solution was developed. By surface bonding the 316 marine grade stainless steel bigHead to the outer skin of the nacelle and passing the threaded stud section through its composite structure, the panel is easily secured or removed by a single person from the much safer interior of the structure. The bigHead’s large perforated head allows a generous flow of adhesive to firmly secure it in position and its outer surface includes an over-moulded insulation layer that safeguards the nacelle against lightning strikes as well as match its colour. bigHead worked with the customer through a stringent development stage - prototyping and extreme testing the solution against the harsh conditions that the offshore wind turbines need to endure until a final design was agreed. Now in its third year of supply, the solution has been thoroughly field proven. Like all bigHead’s produced at its Verwood – UK factory, every production batch is tested and documented with completely traceable results as part of the manufacturers ISO 9001:2008 Quality Management System.

CONTACT US

Tel:86-21-55155796;86-21-63563197
Fax:86-21-63561543
Address:No. 3978, Baoan Highway, Anting Town, Jiading District, Shanghai
Email:wf@wfbearings.com
Website:www.cjcpx.com  www.wfbearings.com

Mobile SiteMobile Site

CopyRight 2017 All Right Reserved Shanghai Junwang Bearing Co.,Ltd
主站蜘蛛池模板: 庆余年1电视剧全集免费观看完整版高清 | 2020澳门免费资料王中王| 澳一肖一码100准确资料大全| 2022澳门全年资料大全| 新在线bt天堂网| 铁算盘澳门| 在线观看高清影视大全| 澳门资料757678最新高手澳门 | 香港藏宝阁论坛| 2020澳门资料大全| 澳门王中王726322com| 今天十五选五开奖公告| 导火线电影国语免费完整版高清| 0149澳门彩官网| 澳门正版资料免费大全2020年| 噢门一肖一码100%准确| 2024新奥免费看的资料| 澳门精准四肖四码期期准V| 全世界最好的你免费观看高清| 2024澳门历史开奖记录今天| 2O4年香港本港免费资料大全| 马会传真,澳门免费资料使用方法| 男男体育生np| 罗马环城高速 罗西| 星辰影院免费观看电影| 中文字幕WWW播放| 今晚我要看澳门特马资料| 2024澳门新资料大全免费周 | 老版跑狗图2024年澳门| 管家婆一肖资料大全019期| 我盛大的同志婚礼| 管家婆一码一肖澳门007期| 藏宝阁澳门正版资料| 正版原创资料| 中国体育竞技体育| 我的老婆是赌圣| 北核体育类期刊| 满山遍野打一生肖| 澳门免费资料大全(中国)有限公司| 新澳门资料大全正版资料玉兔东升| 暗夜和黎明全集免费观看|