2025港资料免费大全,7777788888精准新奥,港彩通免费资料9765下载,王中王493333中特马,二四六天天彩(944CC)资料

广告
Location:Home>>Industry News

Industry News

Senvion Wins Offshore Order over 203 Megawatts for Trianel Borkum II

Time:29 Sep,2016
Senvion, a leading global manufacturer of wind turbines, will deliver the offshore turbines for Trianel Windpark Borkum II. At the Hamburg WindEnergy the conditional contract for the turbine delivery as well as service for the wind farm Trianel Borkum II (TWB II) has been signed with Trianel Windkraftwerk Borkum II GmbH & Co KG. The offshore project shall consist of 32 turbines from the Senvion 6.XM series. After the planned completion in autumn 2019, the offshore wind farm will have an installed capacity of approximately 203 megawatts (MW). Jürgen Geissinger, CEO of Senvion, says: "We appreciate the confidence that the project-consortium Trianel shows in our turbines. This contract confirms that we are setting standards in the cost-effective generation of offshore wind energy and we will further consolidate our strong position in the offshore wind-energy market with the Senvion 6.2M152." The wind farm Trianel Borkum II is planned to be installed 45 kilometers north of the island Borkum in the German North Sea, close to the wind farm alpha ventus, which started operations in 2009 and is equipped with six 5M 126 Senvion offshore turbines . The turbines will be installed in a water depth of 25 to 35 meters. The 32 Senvion 6.2M152 turbines with a power upgrade will produce around 800 million kilowatt-hours of electricity every year and enough to supply around 210.000 households annually. According to the current schedule the final investment decision for Trianel Wind Farm Borkum II should be taken in the first half of 2017. According to that, the construction could start early 2018. "In the first stage of the Trianel Wind Farm Borkum, we have already laid the essential foundations for the expansion of the municipal Offshore engagements. Therefore this project is of high commercial interest for local companies", explains Klaus Horstick, Managing Director of TWB II. Until the investment decision has been taken, further local partners shall be recruited.

CONTACT US

Tel:86-21-55155796;86-21-63563197
Fax:86-21-63561543
Address:No. 3978, Baoan Highway, Anting Town, Jiading District, Shanghai
Email:wf@wfbearings.com
Website:www.cjcpx.com  www.wfbearings.com

Mobile SiteMobile Site

CopyRight 2017 All Right Reserved Shanghai Junwang Bearing Co.,Ltd
主站蜘蛛池模板: 澳门天天彩开奖网站| 澳门码近15期开奖记录香港| 澳彩资料网:踏雪,凌波| 二四六天天免费好彩380cm| 789电影网影视播放| 49217澳彩开奖查询36期| 我知道你喜欢我电视剧在线观看| 米尼的第一次评价| 最好看免费观看高清av| 凡人歌连续剧在线看| 香港正宗挂牌红灯笼| 天下彩资料新版大全| 免费资料大全 正版| 澳彩开奖直播澳门最快开奖结果2023 | 奋进的旋律电视剧免费全集免费播放| 澳门码开奖结果走势图| 澳门大三巴论坛精选| 澳门开奖最新开奖结果| 新澳彩资料免费长期公开2024新澳门| 二四六全年免费大全港免费资料大全| 今晚特马开奖结果号码| 财叔之横扫千军| 免费追剧软件不用vip| 澳门2022全年资料免费看| 澳门一肖一码100精准香港| 韩语日语喜剧迅雷| 新澳天天彩免费大全| 影视大全高清版在线看| 杀出黎明电视剧全集免费观看 | 奥门24年天天开奖免费资料| 澳门资料大全正版资料2…| 888影视网电视剧迅雷 | 澳门精准一码资料公开搜索| 9494澳门最快开奖结果开奖王| 2024澳门跑狗图最新版今天| 躁动的黎明电视剧免费观看| 2021澳门资料大全正版资料| 2024年澳门免费资料49图| 成龙历险记免费观看第一季高清 | 926969澳彩开奖查询| 高清资源在线观看免费|