2025港资料免费大全,7777788888精准新奥,港彩通免费资料9765下载,王中王493333中特马,二四六天天彩(944CC)资料

广告
Location:Home>>Industry News

Industry News

Moventas Gears UK: The MW full-load test facility is now open for business

Time:13 Oct,2016
Moventas Gears UK has announced the achievement of a significant milestone with the completion of the 3.6-MW Load Test Bench and MW Final Assembly centre during August 2016. The gearbox specialist has made a capital investment in the 3.6-MW Load Test Bench, flexibly designed to accommodate Moventas’ multi-brand service approach. Supported by the UK government, the Huddersfield upgrade is part of a Regional Growth Fund initiative. Supported by the UK government, Moventas’ new Huddersfield facility upgrade is part of a Regional Growth Fund initiative. The Test Bench is now operational and ready to support customers with their multi-brand MW requirements. The Test Bench is now operational and ready to support customers with their multi-brand MW requirements. The dedicated MW Final Assembly centre also provides the latest workshop procedures and engineering capabilities to serve this growing multi-brand market. Moventas is the first gearbox service partner in the UK to provide multi-megawatt full load testing, which is an essential part of most gearbox service operations. From now on, serviced gearboxes no longer need to be sent to mainland Europe for testing, which minimizes logistics costs and the carbon footprint. With 35 years of wind-turbine gearbox experience, industry leading technology and state of the art manufacturing facilities, Moventas is ideally placed to support the servicing of the UK installed base of wind turbines from its modern, well equipped service facility in the centre of the country. “I am proud to say that the UK wind industry can really benefit from our highly qualified service team, experienced in the service and repair of gearboxes for all makes of MMW wind turbines,” said Chairman of the Moventas Board, Jim McColl of Clyde Blowers. Moventas can service as many as 20 different turbine brands’ gearboxes covering over 60 models. Focusing on the MW fleets, Moventas UK covers a large aspect of the market including Vestas V80 and V90, Senvion MM82 and MM92, Nordex N80 and N90, as well as the Siemens 2.3 and 3.6 turbines. Moventas UK’s field service team routinely performs a wide range of up-tower inspection and service repairs and upgrades. The Moventas CMaS Condition Management System is used world-wide to provide 24/7 performance monitoring and asset management across its own portfolio of gearboxes and the multi-brand drive trains. Moventas’ objective is to extend gearbox life on existing fleets, innovate with new gearbox technology for next-generation turbines and drive down O&M costs to reduce the total cost of ownership.

CONTACT US

Tel:86-21-55155796;86-21-63563197
Fax:86-21-63561543
Address:No. 3978, Baoan Highway, Anting Town, Jiading District, Shanghai
Email:wf@wfbearings.com
Website:www.cjcpx.com  www.wfbearings.com

Mobile SiteMobile Site

CopyRight 2017 All Right Reserved Shanghai Junwang Bearing Co.,Ltd
主站蜘蛛池模板: 澳门免费大全精准版| 免费追剧免vip影视软件| 今夬澳门买一肖一码| 六给彩票香港开什么号| 长月无烬免费观看全集完整版高清| 北京体育赛事门票| 苹果酒屋法则经典台词| 澳门最精准资料大全资料 | 杀出黎明电视剧全集免费收看 | 澳门免费公开资料最准的资料开奖| 168澳洲幸运5开奖官网开奖| 澳彩历史开奖号码开奖结果近50期开奖助手 | 澳门精准资料大全+正版资料| 2024年澳门开奖历史结果| 澳彩资料站的新网站| 今晚澳门必出准确生肖| 二年级体育活动有哪些| 澳门精准大全正版网站下载 | 13年电影票房排行榜| 白小姐一肖一码一必中一肖| GOTH断掌事件| 港澳最快开奖结果,澳门开奖记录| 2025最准最精准免费资料看| 潜龙突围高清在线观看免费完整版 | 新澳门六开奖号码记录30天| 789电影网高清| 凤凰天机论坛资料大全| 澳门开奖结果451927| 大港澳最新开奖结果| 2025天天开彩资料大全免费下载安装| 下载澳门开奖网址| 正版新澳| 冲出黎明电视剧在线播放免费观看 | 看澳门码资料的网站| 澳门内部会员一码| 澳门正版资料金牛版大全免费| 十选五开奖结果查询| 神算子香港论坛| 007之金手指| 33连在线导航在线| 与君相恋100次|