2025港资料免费大全,7777788888精准新奥,港彩通免费资料9765下载,王中王493333中特马,二四六天天彩(944CC)资料

广告
Location:Home>>Industry News

Industry News

Senvion Concludes 56 Megawatt Antilope Wind Power Project in France

Time:10 Nov,2016
Senvion, a leading global manufacturer of wind turbines, has recently concluded contracts totaling 56.1 megawatts (MW) for the Antilope wind power project in the Hauts de France region with renewable energy developer Eurowatt. Senvion will equip the Champ de la Grand-Mère, Terres Noires and Croix Noire 1 and 2 wind farms with a total of 24 wind turbines from its 2 and 3 megawatt portfolio that will produce enough electricity to power more than 18,600 households in France. The Champ de la Grand-Mère wind farm will feature six MM92 machines with a total rated output of 12.3 MW. Installation will begin by the end of this year and commissioning is planned for March 2017. The Terres Noires wind farm will feature six 3.2M114 turbines with a total rated output of 19.2 MW. Installation is scheduled for May 2017 and commissioning is scheduled for Q3 2017. In May this year, Senvion concluded contracts with Eurowatt for the Croix Noire wind farms 1 and 2. Croix Noire 1 will feature six MM92 turbines and the Croix Noire 2 wind farm will consist of one MM82 and five MM92 machines resulting in a total rated output of 24.6 MW. Installation is due to start at both wind farms by the end of this year with commissioning taking place in Q1 2017. The four wind farms have been agreed on a turnkey basis with Senvion responsible for the foundations, civil works and electrical works which began simultaneously at the three wind farms Champ de la Grand-Mère and the Croix Noire 1 and 2 projects last June. Senvion will also provide full maintenance services to all four wind farms for 15 years and an additional Senvion service centre was opened at Frévent earlier this month. Olivier Perot, Managing Director of Senvion Europe South West, says: "We thank our client Eurowatt for their renewed trust after the installation of 20 Senvion turbines in 2014. The Antilope full turnkey contracts demonstrate Senvion's capability to deliver end-to-end wind energy solutions. These wind farms will lead to the creation of local and highly-skilled jobs through the opening of the Frévent Senvion service center, the fourth in the Les Hauts de France region." Dominique Darne, CEO of Eurowatt Group, says: "These four contracts signed with Senvion are proof of our confidence in the Senvion technology and their team. We are thankful to Senvion for their support during the last four months to secure financing in a complex environment due to the French support mechanism being under pressure. Eurowatt is also pleased to have secured the opening of a service centre close to its operational and future wind farms, supporting performance and creating jobs locally." Last month, Senvion announced the company had reached over 2,000 megawatts installed capacity in France. Senvion was established in France in 2002 and has over 1,000 turbines in operation, from the former MD series to the current MM and 3.XM series.

CONTACT US

Tel:86-21-55155796;86-21-63563197
Fax:86-21-63561543
Address:No. 3978, Baoan Highway, Anting Town, Jiading District, Shanghai
Email:wf@wfbearings.com
Website:www.cjcpx.com  www.wfbearings.com

Mobile SiteMobile Site

CopyRight 2017 All Right Reserved Shanghai Junwang Bearing Co.,Ltd
主站蜘蛛池模板: 2023年澳门开奖记录大全| 澳门六开彩开奖结果资料查询2023开奖记录 | kj77澳门开奖| 澳门免费开奖记录查询2022年| 澳门一肖一码100准第47期 | 澳门最牛三肖三码中特独家资料优势| 中文字幕剧情篇高清| 9070电影网高清| 中国队老将再次征战奥运| 澳门码期期准资料看一| 看新澳门最快开奖| 澳门今晚买马开奖结果| 告白在线观看高清完整版| 澳门管家婆三期必中一期| 天空采票与同行旧版免费大全| 粉红色高跟鞋电影结尾 | 成人用品无人售货店价格怎么样| 2021年澳门正版资料全新解析| 2023年澳门开奖结果澳门开奖结果| 496565澳门资料| 澳门资料站340.999.| 澳门王中王精准资料大全免费公开| 香港4777777开奖结果+开奖结果一| 改朝换代在线高清免费观看| 澳门新生肖2024| 美猴王特码论坛丨马会开奖结果|一肖中特| 中了二肖100元怎么赔| 姐姐免费观看高清电视剧全集 | 惠泽社群精选37628| 免费的短视频app新下载| 澳门图库资料正版49853最准| 澳门码开奖近50期记录| 管家婆一码中奖| 新奥彩管家婆精准免费大全| 2021 年今晚澳彩开奖结果| 小鱼儿精准30码期期必中双| 澳门一肖一码必中一肖免提 | 澳门金牛版免费资料一网| 体育比赛奖金| 精准三期内必出一期| 双鱼座今日运势女生最准|