2025港资料免费大全,7777788888精准新奥,港彩通免费资料9765下载,王中王493333中特马,二四六天天彩(944CC)资料

广告
Location:Home>>Industry News

Industry News

Innergex begins operations at 150-MW wind farm in Quebec

Time:03 Jan,2017
The MU wind farm consists of 47 Senvion turbines, including 46 model 3.2M114 and one model MM92, all engineered for cold climates. The three Mi’gmaq communities of Quebec and Innergex Renewable Energy have officially begun commercial operation of the 150-MW Mesgi’g Ugju’s’n wind farm in Gaspésie, Quebec. The project is owned by the Mesgi’g Ugju’s’n (MU) Wind Farm, an entity controlled 50-50 by the three Mi’gmaq communities of Quebec (Gesgapegiag, Gespeg, and Listuguj) and Innergex. Innergex was in charge of managing construction for the wind farm, and will be responsible for its ongoing operation. The project is located on public lands in the Avignon Regional County Municipality in Quebec. Construction began in May 2015 and was completed within budget. “It is an honor for Innergex to have been chosen as a partner for the Mesgi’g Ugju’s’n project, particularly since it is the first wind project completed in partnership with an Indigenous Nation in Quebec,” said Michel Letellier, President and CEO of Innergex. “It is a project of an exceptional scale that was developed under the leadership of the Mi’gmaq communities.” The average annual production of the MU wind farm is estimated to reach 562,500 MWh, enough to power about 30,000 average Quebec households each year. In its first full year of operation, it is expected to generate revenues and Adjusted EBITDA of circa $59.6 million and $52.5 million respectively. All of the electricity the facility will produce is covered by a 20-year fixed-price power purchase agreement with Hydro-Québec, which provides for an annual adjustment to the selling price based on a portion of the Consumer Price Index. “The completion of construction represents a historic moment for our assembly, the Mi’gmawei Mawiomi, and the Mi’gmaq communities,” said Troy Jerome, outgoing president of the board for the Mesgi’g Ugju’s’n wind farm. “By employing 110 workers from the Mi’gmaq community during the construction of the project, we have shown that such projects can contribute to the social and economic development of the Mi’gmaq communities.” Jerome added that with the start of electricity generation, four Mi’gmaq technicians are also at work on a full-time basis as part of the team that will keep these turbines maintained and running. “We also extend our recognition to the project’s two main contractors, Borea construction and Senvion, for their efforts in attaining these employment goals,” he said.

CONTACT US

Tel:86-21-55155796;86-21-63563197
Fax:86-21-63561543
Address:No. 3978, Baoan Highway, Anting Town, Jiading District, Shanghai
Email:wf@wfbearings.com
Website:www.cjcpx.com  www.wfbearings.com

Mobile SiteMobile Site

CopyRight 2017 All Right Reserved Shanghai Junwang Bearing Co.,Ltd
主站蜘蛛池模板: 2022年必看电影排行榜前十名| 二四六免费资料大全板块| 六码期期必中| 夜明珠开奖—ymz香港| 网络游戏充值的钱可以退吗| 香港挂牌一肖一码精选12码| 澳门三肖三码开奖记录| 新澳门六开彩资料大全2248| 新澳门跑狗图2024年自动更新 | 电视机不用vip的免费追剧软件| 2023年澳门+彩开奖号码| 澳门2021最准最快的资料| 澳门哪里有六组三中三资料| 管家婆2004资料论坛大全| 2024澳门一肖一码100准| 1122影视电影高清| 二四六香港资料期期准现场开码 | 澳门神算一肖一码100精准2023| 澳门周公神算的最新版本更新内容| 澳门王中王精选资料四字澳门王中王精选资料 | 电视剧暗夜与黎明免费在线观看| 电影实时票房排行榜| 2024澳门码精准资料| 正版澳门资料网站大全免费| 澳门精准资料大全澳门9号| 澳门2023年最精准免费资料| 新奥门精准资料大全| 新澳门资料大全正版资料?奥利奥| 澳门平特肖资料网站| 澳门精品图库开奖记录2024年| 大三巴一肖一码澳门| 4949澳门今晚开奖结果| 澳门免费传真图正版| 澳门金牛版资料免费大全下载| 澳门精准三肖三码三天内必开出| 新澳2024今晚开奖资料四不像| 花吃了那女孩全本复盘| 澳门六下彩网金牛版| 澳门2024开奖结果近15期| 体育赛事安排表| 坏姐姐之拆婚联盟|